Ambirad VISION VSO Instrucciones de operaciones Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 22
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
Slacken screw in burner lid and open the right
hand burner access door.
The two vacuum impulse hoses are in view.
Both hoses are fitted with ‘T’ pieces, one end of
which has a blanking cap.
Remove each blanking cap.
Connect extra sections of hose to each ‘T’
piece.
Connect either a digital manometer or U tube
gauge to the open ends of the hoses.
Check reading against technical data.
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 21 22

Comentarios a estos manuales

Sin comentarios